info@desert-technologies.com
Search
Close this search box.

About us

FIRST MOVERS IN THE SAUDI SOLAR ENERGY INDUSTRY

dt Industries operates the most advanced PV assembly line in Saudi Arabia with an annual capacity of 110 MW, based out of its factory located in Jeddah. The plant can produce high-efficiency PERC monocrystalline modules (up to 540Wp power output).

dt Industries targets the local and international market of utility scale, C&I and residential customers.
dt originated in 2012 bringing together a team of leading experts with extensive experience in originating, developing and managing power projects and PV manufacturing operations.

The Team

The
Team

Majid Refae

Chief executive officer of desert technologies industries

Mohammed Baagiel

Director of desert technologies industries

Mohammed Alassaf

Director of business development

Manufacturing
Facility

OUR MANUFACTURING FACILITY

dt is driving the industry with unparalleled quality and performance. Our high-performance PV modules are fit for all utility, commercial, and residential projects by providing a very competitive Levelized cost of energy. The key differentiating feature of our modules lies in durability and high performance in extreme temperature environments, which makes it ideal for desert climates as well as other terrain environments

  • Fully automatic Production Line with 300 MW per annum capacity.
  • State of the Art Laboratory for Raw Material Testing.
  • Line capable to produce mono-facial as well as Bifacial cell modules.
  • State of the Art Laboratory for Reliability Testing.

BEST IN CLASS MACHINERY GLOBALLY
BENCHMARKED

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Stringer
Auto Layup
Bussing
Eva & Back sheet placement
pre LAM Visual Inspection
Lamination
Trimming
post LAM visual inspection
Framing
Junction Box
flash test & hiBot
Off-Load
Final EL inspection
Sorting
Packing

Panel Description

Panel
Description

dt’s Industrial Model is based on mono-PERC crystalline silicon, proven and mature technology with a large room for improvements.

Our production line employs a sophisticated, fully automated manufacturing process supported by the most technologically advanced equipment from Germany, Switzerland and Finland. To maximize our throughput and ensure a high-quality product, we set up a tight control at each stage of the production.

YEAR 2019 - 110 MW CAPACITY
YEAR 2025 - 3 GW CAPACITY

Strategic partners

track records

track
records

DOMESTIC ENGAGEMENTS

Al Hamra Mall

2 MW

Residential Installation

30 KW

SCMC Factory

4 MW

Dakar Rally

156 KW

SNB Carport

24.7 KW

CROSS
BORDER ENGAGEMENTS

Spain

2 MW

Mozambique

30 KW

Germany

1.67 MW

Greece

11 MW